Glengara Retirement Village
Topsteel Solutions have had the privileged to work with Stevens Construction on this latest Retire Australia development. This design and construct involved a redesign to use our light gauge steel frames and trusses which extended to replacing a proposed suspended slab with our steel joists system. The steel joists system not only saved the client considerable time but also reduced costs of using a suspended slab.
Facts:
Size – approx 8000 sqm over 2 levels
Bluescope Steel – approx 117,000 m of Truecore steel
Structural Steel – approx 30t